Master Course in Earned Value Management (EVM)

Project managemet, EVM, Agile, Cost Control, EVM Expert, Planned value, Earned value and Actual costs, PMP

1000 Coupons are used

24 hours passed

If YOU are an Electrical Engineer then following quiz is for YOU

0%
2

Electrical Engineering

Simple things to boost your creativity

Smart Series Quiz-1

These questions are taken from smart series book which covers all the subjects of Electrical Engineering and Technology Field

1 / 30

Category: Basic Electrical Engineering

1) If the input capacitor of a power supply is shorted, it will result in

We have to maintain flatness of the surface.

2 / 30

Category: Power System Analysis

2) Which of the following are considered as disadvantages(s) of Gauss-Seidel method over Newton Raphson method in load flow analysis?

3 / 30

Category: Power Plant

3) Landfill gas is actually _______ used in thermal power plants.

4 / 30

Category: Power Transmission and Distributions

4) For which purpose bundled conductors are employed to a power system

5 / 30

Category: Power System Analysis

5) There are ____ types of dependent sources, depending on the controlling variable and output of the source.

6 / 30

Category: Basic Electrical Engineering

6) Which line is obtained by the method of least square?

7 / 30

Category: Probability

7) What is the probability of a number “2” when a dice is thrown?

8 / 30

Category: Power Plant

8) The average fossil fuel plant convers about is ______ % of the power going in to the power going out.

9 / 30

Category: Electroncis

9) SCR (Silicon Controlled Rectifier) goes into saturation, when gate-cathode junction is

10 / 30

Category: Power Plant

10) ______ is a by-product of paper industry, which is used by many industries as a primary source of electricity.

11 / 30

Category: Electroncis

11) Discrete device field effect transistor is classified on the basis of their

12 / 30

Category: Power Electroncis

12) If the firing angle in an SCR rectifier is decreased, output will be

13 / 30

Category: Power Transmission and Distributions

13) Drop out to cut off ratio for most relays is of the order of

14 / 30

Category: Network Analysis

14) Admittance is the reciprocal of

15 / 30

Category: Power System Analysis

15) Which of the following ideas means deciding at runtime what strategy to summon?

16 / 30

Category: Singal and Systems

16) The _____ time signal is described for all values of time.

17 / 30

Category: Electrical Machines

17) Fundamental property used in single node pair circuit analyzer is that ______ across all elements is same.

18 / 30

Category: Electrical Machines

18) Radio frequency chokes are air cored to

19 / 30

Category: Singal and Systems

19) Main purpose of modulation process is to

20 / 30

Category: Power Plant

20) If field resistance of DC shunt generator is increased beyond its critical value, the generator

21 / 30

Category: Basic Electrical Engineering

21) Conjunction x ^ y behaves on digits 0 and 1 exactly as ____ does for ordinary algebra.

22 / 30

Category: Basic Electrical Engineering

22) Fourier series are infinite series of elementary trigonometric functions i.e. Sine and

23 / 30

Category: Power System Analysis

23) Power in AC circuit is found by

24 / 30

Category: Telecommunications

24) Modulation index in amplitude modulation

25 / 30

Category: Power System Analysis

25) The quantity “Rm” which relates dependent voltage to controlling current is called

26 / 30

Category: Basic Electrical Engineering

26) At very sunny places this source(s) of energy can be found

27 / 30

Category: Electrical Machines

27) A transformer transforms

We have to maintain flatness of the surface.

28 / 30

Category: DC Machines

28) The Pole Shoes of DC Machines are fastened to the pole core by:

29 / 30

Category: Power Transmission and Distributions

29) Which of the following conditions relate line resistance ‘R’ and line reactance ‘X’ for maximum steady state power transmission on a transmission line?

30 / 30

Category: Electroncis

30) A semiconductor device is connected in a series circuit with a battery and a resistance. If the polarity of battery is reversed, the current drops almost to zero. The device may be

Your score is

The average score is 28%

Share this quiz with your friends to help them

LinkedIn Facebook Twitter
0%

Disclaimer:

These course coupons are offered by the official website and we do not have any type of ownership of courses.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top